Gminna Przystań Wiślinka – jak u Pana Boga za piecem…

Date added: 2019-01-07, Time11:49:23

Wieś Wiślinka (niedaleko Sobieszewa) zamieszkuje niespełna 1200 osób. Latem ta liczba pewnie wzrośnie dzięki turystom – w tym dzięki wodniakom nowo wybudowanej Gminnej Przystani... more »

O Pętli Żuławskiej dzieci czytają już w podręcznikach szkolnych!

Date added: 2018-12-11, Time12:40:16

  more »

On 1 November 2018, the Sobieszewo Drawbridge, long awaited by water sport fans, was officially put into service

Date added: 2018-11-19, Time15:38:08

The drawbridge over the Martwa Wisła (Still Vistula) at Sobieszewo was long awaited by both water sport fans and the residents of Sobieszewska Island. The pontoon bridge impeded free boating... more »

Around the world in three days and a great meeting of the industry: the 3rd World Travel Show International Tourism Fair, with the Żuławy Loop of course, has drawn to a close

Date added: 2018-10-23, Time09:29:31

The third edition of the World Travel Show International Tourism Fair at Ptak Warsaw Expo has drawn to a close. The show had over 800 exhibitors, including 300 international ones. The... more »

Together, let’s test the app which will lead us through the Żuławy Loop!

Date added: 2018-09-21, Time10:52:47

The NaviSail app, free to download from Google Play or App Store, covers over 20,000 inland water routes all over Poland, now also including the Żuławy Loop (Pętla Żuławska). You will... more »

Re-enactment of the Battle of the Vistula Lagoon is this weekend. See you in Kąty Rybackie!

Date added: 2018-09-13, Time13:36:26

Sztutowo Municipality and the EUREKA European Association for Education and Creative Activity invite you to a re-enactment of the Battle of the Vistula Lagoon, on Saturday, 15... more »

GO TO ARCHIVE

Delays at the Sobieszewo drawbridge on the Martwa Wisła

Date added: 2018-07-06, Time13:19:55

Due to the planned transport and assembly of a steel structure, here is an update on when there will be delays for boats around the drawbridge (under construction) of Voivodeship Road 501 over the Martwa Wisła (Still Vistula) at Gdańsk Sobieszewo:

 

• during the assembly of a draw span from the Sobieszewska Island side, 16-19 July 2018,

 

• during the assembly of a draw span from the side of the town of Wiślinka, 23-26 July 2018.

 

• Day 1-2: a pontoon is brought in between the supports of draw spans, moored and ballasted; the steel structure for the “40” span (from the Sobieszewska Island side) is prepared for mounting, i.e. the span’s structure is dismantled, hydraulic equipment for the slide-on technique is connected and the hydraulic system is tested;

 

• Day 3: the steel structure of the “40” span is mounted, at the same time the pontoon is ballasted and the structure is slid onto the support;

 

• Day 4: the pontoon is removed from between the supports of the draw spans and is swivelled to allow the mounting of the steel structure of the “30” span (from the side of Wiślinka);

 

IMPORTANT: The installation process may be extended due to unfavourable weather conditions (strong wind, big waves, high fluctuation of the water level in the river).

 

At the same time, the Contractor has notified that, for the remaining period of span assembly, there may be short breaks and delays in sailing for vessels within the clearance of the bridge caused by the manoeuvring of equipment and by the assembly technology.

February 2019
Sun Mo Tu Wed Th Fr Sat
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28    
             

22

February 2019

Czy twoim zdaniem do pływania po Pętli Żuławskiej przydałaby się nowa aplikacja z nawigacją na telefon?

YES (63%)

NO (37%)

If you want to be informed about the different event and events related to the loop Zulawska subscribe to the newsletter. Enter your e-mail and join our database

You can always unsubscribe from the newsletter by clicking the link in the footer of the submitted through e-mail us





~Admin

Żadne posty (jeśli nie są obraźliwe) nie są usuwane z naszego forum....

~EDU

O jakich łodziach mowa?

~salo

Podzieli się ktoś wiedzą o planowanych w tym roku spływach, regatach,...

Projekt współfinansowany przez Unię Europejską z Europejskiego Funduszu Rozwoju Regionalnego

Urząd Marszałkowski Województwa Pomorskiego, Departament Infrastruktury, ul. Okopowa 21/27, 80-810 Gdańsk, tel: 58 32 68 171, petla@pomorskie.eu

Przypomnienie o pracach związanych z przebudową i remontem urządzeń hydrotechnicznych węzła wodnego w Przegalinie oraz zamknięciem śluzy w okresie od 1 października 2019r. do 31 maja 2020r.

Menu