select language:

PROJECT

Was ist die Werderschleife

Aims of the project

Timetable for execution of the project

Project Partners

Project Scope

The tasks of the project

 

WIRTUAL TOUR

The Centre of the Tour and Entertainment of the Zulawska Loop is a multimedia platform, effectively presenting the investments that were executed under the project of the network of ports and... more »

E-GUIDE

The virtual guide of the Zulawska Loop is a compendium of knowledge about the waterways of the Vistula River delta and the Vistula Lagoon.
more »

ESSENTIALS

The Żuławska Loop is an attractive waterway connecting with each other water routes of the Vistula, Martwa Wisła, Szkarpawa, Wisła Królewiecka, Nogat, Wisła Śmiała, Wielka Świętej - Tuga, Motława,... more »

The tasks of the project

   

The name of the task: Construction of sailing marina in Blotnik

Partner: Cedry Wielkie Municipality
The period of the investment: 2011 - 2012

Object - sailing marina. In hydro-technical part, the investment program involved construction of mooring platforms for yachts, floating anchored to the existing sheet piling dolphins and draft pipe piles. Floating, steel platforms were equipped with streamer mooring points and power and drinking water consumption points. The land part included devices for marina handling, i.e.: three mooring bridges, car parks of active substance for 32 vehicles and sanitary and technical facility. Mooring points are equipped with railings, power and drinking water consumption points. For sewage collection from mooring units at platforms subpressure sanitary sewage system was installed, completed at entrance to each platform. In addition, in the western part of marina there is slip with electric winch. Capacity and dimensions of slip allows lifting ballast yachts of length up to 12m from water. The length of the ramp is 15m. In addition, marina has a two-storey facility, on the first floor of which there is observation deck, on the ground floor there are administrative and training facilities, bosun facility, security room, toilets, showers and laundry facilities. In addition, LV power lines were provided.


The name of the task: Construction of drawbridge at sluice in Przegalin

 Partner: Gdansk City Municipality
The period of the investment: 2011 - 2012

Supporting facility - drawbridge. The investment is located in Przegalin, in immediate vicinity of sluice. The task included construction of drawbridge in flap bridge technology with span range 18.30 m and overall length 22.5 m. Additionally, control facility for drawbridge operation was modernised. Designed drawbridge prevents from shipping of yachts without folding masts on waterway from Gdansk to the Vistula Lagoon.


The name of the task: Electrification of Gdansk-Glowa sluice

Partner: Regional Water Management Board in Gdansk (RZGW)
 The period of the investment: 2012

Supporting facility - sluice. The investment task involved: electrical system and control system for sluice drive devices, modernisation of drive system of sluice chamber gates and butterflies valves, video monitoring system allowing for observation of top and bottom outer marina and sluice chamber using 3 cameras (for this purpose monitor and video recorder were installed in the sluice service office) and automatic control system.


The name of the task: Construction of mooring platforms in Drewnica

Partner: Stegna Municipality
The period of the investment: 2011 - 2012

Supporting facility - mooring platform. The task involved reconstruction of wharf and embedding of two mooring platforms. Bridges with gangways allow mooring of small floating units, waiting for travelling under the bridge. The bridge at the western part is 20 m long, at the eastern part it is 30 m long. They are equipped with protective railings and rescue equipment. In the vicinity there are solid waste bins.


The name of the task: Construction of sailing marina in Rybina

 Partner: Stegna Municipality
 The period of the investment: 2013 - 2014

Facility - sailing marina. The task involved embedding of 3 mooring platforms, each of them is 2.4m wide and 30m long, over its entire surface has wooden board, equipped with steel mooring posts, wooden stop beams, steel hatchway ladder and exit trap to land and stand with rescue equipment. Cap wharf was constructed for passenger ships of up to 100 meters long, and marina handling facility, entrance route, manoeuvring place and parking for 9 vehicles. Marina land development includes lighting, landscape architecture (waste bins, benches), connection of marina facility to water and sewerage system and electricity Wharf equipment with cast iron mooring posts, steel hatchway ladders, columns for supply in drinking water and electricity, post for collecting pollutants from ships, rescue equipment.


The name of the task: Construction of sailing marina in Oslonka

Partner: Nowy Dwor Gdanski Municipality
 The period of the investment: 2011 - 2012

Facility - sailing marina. The task involved construction of wooden mooring platform, which allows simultaneous mooring of 6 yachts of length of up to 7 m. The platform is equipped with mooring posts, stop wall, wooden railing of height of 1.10 m, illumination of platform, power and water consumption point and life-saving wheel. Land development also includes marina handling facility with toilets and a shower available for the disabled. In addition, the area includes umbrella roof for feasts, positions for meals preparation and washing up, volleyball field, parking place, camp-site and water consumption point. Marina area is illuminated and fenced.


The name of the task: Construction of mooring platforms in Tczew

Partner: Tczew City Municipality
The period of the investment: 2011 - 2012

Facility - mooring platform. The task involved construction of mooring platforms with stairs to the platforms, located on the left bank of the Vistula River, approx. 1 km upstream from the passenger and sailing marina, opposite ZHP Sailing Club. The facility has 2 mooring platforms, which are unusual due to the fact that they are carried out by the truck moving on special trackway, descending from the crown of the Vistula slope - down to the river bed. This ensures continuous operation of the marina over the full range of water level in the river. This also allows safe descent to the river, launching of rowing boats and mooring of small flowing units regardless of water level in the river.


The name of the task: Construction of sailing marina in Biala Gora

Partner: Sztumski County
The period of the investment: 2011 - 2012


Facility - sailing marina. The task involved construction of water marina on the Nogat River, opposite the existing sluice. The facility has marina for passenger ship and 13 parking places for tourist units (sailing yachts and motorboats) of length up to 7 m, which have been equipped with mooring devices (bollards with pin) and stop (PCV strips), wooden board, power and water consumption point and safety devices - hatchway ladders and rescue sets. The marina has also slip for boats, winter hangar and water equipment. Social facilities include toilets with showers with separate toilet for the disabled, kitchenette and observation decks in the form of wooden trellis targeted toward the object. Additionally, there is room for marina bosun. Land development included walking routes in the direction of excursion wharf, parking places, lighting, and water and sewage system and electricity.


The name of the task: Construction of sailing marina "North Park" in Malbork

Partner: Tczew City Municipality
The period of the investment: 2011 - 2012


Facility - sailing marina. The task involved construction of floating platforms with entrance gangways and mooring legs as well as reinforcement of the bank at length approx. 55 m with ramp. The facility has 24 mooring posts for yachts and floating units. It is also possible to moor and launch of kayaks. Two small facilities are within the area of the marina. In the facility situated perpendicular to the river, with full visibility of the river and across the marina there is bosun room with handy storage area. However, the other facility is situated parallel to the river and consists lavatories, as well as for the disabled, showers, small kitchen for sailors. In front of the facility there are typical locations for barbecue for self-prepared meals consumption. Marina area is illuminated and fenced. It is equipped with water, sewage and power connections.

Nazwa zadania: Budowa przystani żeglarskiej przy zamku w Malborku

Partner: Gmina Miejska Malbork
Okres realizacji: 2013 - 2014

Obiekt - przystań żeglarska. Przebudowano istniejące nabrzeże przystani po wschodniej stronie Nogatu przy kładce pieszej. Nowe nabrzeże umożliwia cumowanie jednostek pływających dla obsługi turystycznej. Dostosowano również istniejący układ drogowy i sieć oświetlenia dla potrzeb obsługi przystani.



The name of the task: Extension of sailing harbour in Elblag

Partner: Elblag City Municipality
 The period of the investment: 2011 - 2012

Facility - sailing marina. The hydro-technical part of the investment program included yachts pool adjustment for operation of floating units of immersion up to 2.5m. Yachts mooring in the pool have, in addition to safe mooring structure achieved by converting wharf, access to electricity and drinking water. There is mobile point of sewage collection from floating units in the harbour. Safe movement of pedestrians in the area after dark, on floating mooring platform is provided by lighting installed on platforms. The harbour has 40 posts for mooring of units, as well as crane of capacity of 10 ton (installed capacity 13kW).


The name of the task: Land development of the western wharf of the harbour in Tolkmicko

Partner: Tolkmick Municipality
The period of the investment: 2011 - 2012


Facility - harbour. The hydro-technical part of the investment program included reconstruction of the western wharf and embedding of platform for 12 yachts, which is equipped with rescue ladders, stands with rescue wheels, mooring footbridge mounted directly on platforms and y-booms. Next to the platform marina there is social-sanitary facility for handling of yacht teams, in which there are two sanitary units with separate washrooms and washer-dryers, toilets and showers for men and women and cache kitchen with dining attachment. The facility is adjusted for the disabled. Land development included landscape architecture, reconstruction and extension of access road to the harbour, construction of shared zone and parking areas as well as media supply.


The name of the task: Construction of sailing marina in Braniewo

Partner: Braniewo City Municipality
The period of the investment: 2010-2011


Facility - sailing marina. The hydro-technical part of the task included construction of 1 mooring platform for yachts and small units of inland waterway transport. Technical solution involved floating platforms (3 pcs. of length of 10 m, 2 gangways). The land part of the task involved construction of bosun facility and sanitary facilities as well as land development including construction of shared zones, media provision and landscape architecture. Marina area is developed, illuminated and fenced. All facilities in the marina are available for the disabled.


The name of the task: Construction of sailing marina in Nowa Pasleka

Partner: Braniewo Municipality
The period of the investment: 2011-2012


Facility - sailing marina. The bank at length of 172 linear meters was strengthened, 21 y-booms, including 11 y-booms with bridge were designed. In addition, access road to marina was constructed in a form of shared zone, parking for 22 vehicles; LV electricity line, water supply and sewerage system were provided. Sailors are provided with sanitary container acting as sanitary node for marinas, with toilets: male, female and for the disabled, waste container, five points of water consumption for filling water tanks by yachts teams as power consumption points (connection posts). Supporting facility - drawbridge. Drawbridge was construction through harbour channel at mouth to the Pasleka River.


The name of the task: Extension of yacht harbour in Krynica Morska

Partner: Krynica Morska City Municipality
The period of the investment: 2011 - 2012


Facility - yacht harbour. The hydro-technical part of the investment program involved extension of breakwaters and quay modernization: extension of the Northwest wharf, extension of bosun wharf with slip, extension of the North-East wharf, construction of fixed platform 1, construction of fixed platform 2 and floating mooring platforms at platforms 1 and 2, which allow mooring for yachts of lengths from 6.0 to 12.0 m. Wharves, platforms and piers were equipped with water supply, sewerage and electricity.


Extension of harbour in Katy Rybackie

Partner: Sztutowo Municipality
The period of the investment: 2013 - 2014


Facility - harbour. The task involved construction of fixed platform of length of 56.97 m, connecting existing wharf with staying-mooring platform, designed in modular form - 3 floating concrete platforms of length of 20 m each and width of 4 m with foothold, mooring legs, gangway and ramp for yachts launching. Platforms were equipped with cleats, ladder columns of drinking water and electricity supply, pedestals for collection of sewerages from ships, rescue equipment. The land part includes sanitary handling facility for yachts marina; road surface was performed and parking spaces, pedestrians part, marina illumination and systems: pipework, electrical, sewage and rain, sanitary sewage system were provided.

April 2018
Sun Mo Tu Wed Th Fr Sat
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30          
             

26

April 2018

Czy twoim zdaniem do pływania po Pętli Żuławskiej przydałaby się nowa aplikacja z nawigacją na telefon?

YES (66%)

NO (34%)

If you want to be informed about the different event and events related to the loop Zulawska subscribe to the newsletter. Enter your e-mail and join our database

You can always unsubscribe from the newsletter by clicking the link in the footer of the submitted through e-mail us





~Admin

Żadne posty (jeśli nie są obraźliwe) nie są usuwane z naszego forum....

~EDU

O jakich łodziach mowa?

~salo

Podzieli się ktoś wiedzą o planowanych w tym roku spływach, regatach,...

Projekt współfinansowany przez Unię Europejską z Europejskiego Funduszu Rozwoju Regionalnego

Urząd Marszałkowski Województwa Pomorskiego, Departament Infrastruktury, ul. Okopowa 21/27, 80-810 Gdańsk, tel: 58 32 68 171, petla@pomorskie.eu

Wznowienie pracy śluz oraz otwarcie żeglugi

Menu